. MAINTENANCE SERVICE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING CHECKING FUNCTION OF ACCUMULATOR 4 - 66 The ac cumulator is c harged with high-pr essure nitrogen ga s, so mistaken operation may cause an expl osion, which will le ad to seriou s injury or dam age. When handling the accumulator, always d o as f ollows. The pressure in th e hydraulic circuit c annot be complete ly remov ed. W hen removing the hydraulic equipment, do not stand in t the he direction tha t the oil spurts out when carrying out the operation. In addition , loosen the bolts s lowly when carryin g out operation. le the accumulator. r flame or dispose of it in fire.
in it or weld it. , or subject it to any impact. Do not disassemb le the accumulator. Do not bring it nea r flame or dispose Do not make holes in it or weld it. Do not hit it, roll it , or subject it to any Wh en disposing o f the accumulator, the gas must be r eleased. Please contact y our Komatsu distri butor to have this work car ried out. FUNCTION OF ACCUMULATOR e in the control circuit. Even The a ccumulator s tores the pressur circuit. Even after t he engine is stopped, the cont rol circuit can be operate d, so the fo llowing action s are possible.
If t he control lev er is operated in t he direction to lo wer the work eq un uipment, it is possible for the work equipment to go down eight. the hydraulic circuit can be released. own der its own w Th e pressure in the hydraulic circ uit can be releas The a ccumulator is installed to the p osition shown in on th e right. Repla ce the accum ulator every 2 ye ars or every 400 0 hours, whichever Chec k the nitrogen gas charge pres sure as follows. ground. 1. S top the machi ne on firm, level 2. S et the parking brake lever to th e LOCK position