Engine Speed Demand The strategy for choosing the correct speed input device is also summarized in the table below. 11.14.2 Throttle Arbitration Strategy Configuration The programmable parameter Desired Speed Input Configuration is no longer necessary. Throttle arbitration strategy eliminated the need for Desired Speed Input Configuration. 11.14.3 Throttle Arbitration Strategy Installation Throttle arbitration strategy is set within the industrial software and cannot be altered.
I N D U S T R I A L E N G I N E E L E C T R O N I C S 78 INDUSTRIAL ENGINE THROTTLE ARBITRATION STRATEGY Desired Engine Speed Input Method Priority Arbitration ET Override (dyno test mode) 1 - Intermediate Engine Speed Switch 2 - SAE J1939 TSC1 (Mode 1) 3 - PTO (Power Take-Off) 4 Max wins TPS (Throttle Position Sensor) 4 Max wins