Stockpile OPERATION 3. When the material is in a stockpile, keep the cutting edge of the bucket horizontal; when loading blasted rock, have the bucket tilting slightly down. Be careful not to get blasted rock under the bucket. This will make the front tires come off the ground and slip. Try to keep the load in the center of the bucket; if the load is on one side of the bucket, the load will be unbalanced. Blasted rock 4. At the same time as thrusting the bucket into the material, raise the lift arm to prevent the bucket from going in too far. By raising the lift arm, ample traction is produced by the front tires.
Remark If the bucket is thrust too much and the lift arm stops rising or the machine stops moving forward, release the accelerator pedal a little. Proper operation of the accelerator pedal for each type of soil is effective for saving fuel and preventing tire wear. 5. Check that there is enough material loaded into the bucket and then operate the bucket control lever to tilt the bucket and load the bucket fully. Remark If the bucket edge is moved up and down while pushing in the bucket and digging, the front tires will come off the ground. This will cause the tires to slip. WA430-6 2-121