DOOSAN ŠKODA POWER — DOOSAN ŠKODA POWER Steam Turbine Assembly Manual

Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika from opening in the top foundation slab. § Lifting of 4 anchor bolts, getting them through and hanging of rear LP casing § Installation of “the lost shuttering for future embedding of pedestals into the grout. § Assembly of lower nuts of foundation bolts from the footbridges. § Preparation of pedestals for the bearing stands installation (washing of preservation, greasing of grooves etc) § Reduced tightening of the anchor bolts of all pedestals with the altitude and level setting at the parallel time.

4) Assembly of bearing stands z otvoru v hornн zбkladovй desce. § Zvednutн, provlečenн a zavěšenн 4 ks kotevnнch šroubů na každэ kozlнk NT zadnнho tělesa § Montбž „ztracenйho bedněnн“ pro budoucн zalitн kozlнků do zбlivkovй hmoty . § Montбž spodnнch matic kotevnнch šroubů z pochozнch lбvek. § Přнprava kozlнků pro montбž ložiskovэch stojanů (mytн konzervace, promazбnн drбžek atd) § Redukovanй utaženн kotevnнch šroubů se současnэm nastavenнm vэšky a vyrovnбnнm všech kozlнků.

4) Montбž ložiskovэch stojanů § Montбž ložiskovэch stojanů turbiny na připravenй kozlнky, otevřenн stojanů, kontrola ložisek po dopravě § Instalace stojanů pro měřenн na strunu § Stranovй vyrovnбnн ložiskovэch stojanů na strunu, vyjmutн struny. § Vloženн kroužků kontrolnн hřнdele do ložisek a nastavenн předepsanй vэškovй polohy ložisek. Měřenн vэšky ložisek se provбdн přнstrojem pro optickou nebo laserovou nivelaci běžnй přesn osti. Nastavenн polohy ložisek se provбdн pohybem celэch ložiskovэch stojanů s kozlнky (zasouvбnн zбkladovэch klнnů ve dvojici, podklбdбnн).

§ Vloženн celй kontrolnн hřнdele s kroužky do ložisek, nastavenн přesnй polohy ložiskovэch stojanů podle vэkružků ložiskovэch stojanů (horizontбlnн rovina, nбklon). Měřenн se provбdн § Assembly of the turbine bearing’s stands on arranged pedestals, opening of stands, checking of the bearings after transport § Installation of holders for string measuring § Setting of side position of the bearing stands according to the string, string taking off § Inserting of the rings of dummy shaft into bearings and setting of the prescribed bearingsґ altitude. Measuring of the bearingsґ altitude is done by apparatus for optic or laser levelling with usual accuracy.

Setting of bearingsґ position is done by moving with whole stands with pedestals (shift of wedges in couple, shimsґ inserting). § Putting of the whole dummy shaft with rings into bearings, setting of the accurate position of bearing stands according to the circullar recess of bearing stands (horizontal plane, slope). Measurement is done by the inside Date: 12.11.2013 Page 104 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ Attention:

During moving of pedestals, getting the anchor bolts through and the nut assembly it is prohibited to enter on the platform in place of LP casing and under the top foundation slab in place of support deck for bolts (around the condenser and between the columns of foundation stool). Upozornění: Během navlékání kozlíku na kotevní šrouby a montáže matic je zakázán vstup na plošinu v místě NT tělesa a pod horní základovou desku v místě opěrné plošiny šroubů (kolem kondenzátoru a mezi sloupy základové stolice). § Assembly of scaffolding and erection of walk- able footbridges with handrails beside the places for lower nuts of foundation bolts. Check and safety marking of the footbridges.

§ Montáž lešení a zbudování pochozích lávek se zábradlím vedle míst pro spodní matice kotevních šroubů. Kontrola a bezpečnostní označení lávek. § Removing of platforms from the openings for turbine casings in top foundation slab and providing of safety measures around these openings (railing). § Odstranění plošin z otvorů pro tělesa turbiny v horní základové desce a provedení bezpečnostního zajištění těchto otvorů (zábradlí).