Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika § Connecting of piping and cables to servomotors and the bodies of HP and IP SC. § Setting of tilt of struts of valvesґ bodies into operational state (releasing of splice-bars, shifting and repeating tack-welding of the splice-bars). Repair of painting around the welds (after the completion of pressure tests on piping). § Assembly of thermal insulation. § Preparation of the valvesґ bodies for proceeding of purge processes on steam inlet pipeline:
replacement of in-built provisories for pressure test in Stop valves to provisories for the chemical cleaning and steam-blowing including the counter-flange of provisory piping. 12) Preparation of boxing up of LP and IP casing § Taking of the lower halves of diaphragms out, cleaning of the casings and diaphragms by the blowing with pressured air, putting the parts back. § Inserting of LP an IP rotor, checking and corr ecting of the rotorsґ catenary into deflection curve for TG operation. § Assembly of traverses between the bearing stands and bottom of HP and IP casing including the re-machining and installation of spacers.
Fixation of the set position of components (assembly of pins, welding). § Greasing of the contact surfaces, connecting pieces and screws, repair of the sliding lack in threads. § Checking of the free passage of holes at steam pressure measurement and drainage system. § Measuring of the final clearances in the steam flow path and issue of the report about. 13) LP casingsґ boxing up § Assembly of the upper parts of gland bodies and cones. § Assembly of guiding pins into the flange of parting plane § The sealing paste aplying onto parting plane of LP inner casing, moving of the cover on bottom part and tightening of screws in the parting plane of the casing.
§ Assembly of top parts of deflectors and completion of covering sheet s assembly. § Completion of assembly of drainage piping § Připojenн potrubн a kabelбže na servomotory a těles a VT a ST RZR ventilů. § Nastavenн nбklonu vzpěr těles ventilů do provoznнho stavu (uvolněnн přнložek, posunutн a opětnй přistehovбnн přнložek). Oprava nбtěru okolo svarovэch ploch (po ukončenн tlakovэch zkoušek na potrubн). § Montбž tepelnэch izolacн. § Přнprava těles ventilů na vykonбnн čistнcнch operacн na potrubн přнvodu pбry: vэměna vestavby RZ ventilu pro tlakovй zkoušky a instalace vestaveb chemickй čištěnн a profuk parovodu včetně protipřнruby provizornнho potrubн.
12) Přнprava na zavřenн NT a ST tělesa § V yjmutн spodnнch polovin rozvбděcнch kol, vy čištěnн těles a rozvбděcнch kol vyfoukбnнm stlačenэm vzduchem, vloženн dнlů zpět. § Vloženн NT a ST rotoru, kontrola a korekce vyrovnбnн rotorovй soustavy do průhybovky na provoz TG. § Montбž traverz mezi ložiskovй stojany a spodek VT a ST tělesa včetně opracovбnн a instalace mezikusů. Pojištěnн nastavenй polohy dнlů (montбž kolнků, svary). § Promazбnн stykovэch ploch, spojovacнch dнlů a šroubů, oprava kluznйho laku v zбvitech. § Kontrola průchodnosti děr měřenн tlaku pбry a odvodněnн. § Proměřenн finбlnнch vůlн v ustavenн parnн průtočnй čбsti a jejich zaprotokolovбnн.
13) Zavřenн NT a ST těles a § Montбž hornнch dнlů těles ucpбvek a kuželů. § Montбž vodнcнch svнček do přнruby dělнсн roviny § Nanesenн těsnнcн pasty na dělнсн rovinu NT vnitřnнho tělesa, zavezenн vнka na spodek tělesa a dotaženн šroubů dělнсн roviny tělesa . § Montбž hornнch dнlů deflektorů a dokončenн montбže krycнch plechů. § Dokončenн montбže potrubн odvodněnн a Date: 12.11.2013 Page 109 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ