Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika and the piping of spray-water for cooling of steam down including the pressure tests. § Assembly of the cover of LP outer casing and tightening of screws in the parting plane of the casing. § Assembly of compensators and relief membranes onto the cover of LP outer casing. § Moving of the covers of inner casings and carriers to IP casing § Assembly of the covers of outer casing and tightening of screws in the parting planes of the casings. ATTENTION:
Below described assembly work can be carried out only after the embedding of pedestals into grout and after the final TG alignment not earlier then 2 months before turbine start-up (forming of the concrete foundation). · Measurement of the actual dimensions for re- machining of Distance washers for the altitude and side position of inner LP casing inside LP outer casing. · Re-machining of the washers according to the measurement. · Replacing of the temporary washers to the final washers. · Welding to fix the position of some components. 14) Completion of machining of holes for vodnнho sestřiku pбry včetně provedenн tlakovэch zkoušek.
§ Montбž vнka NT vnějšнho tělesa včetně dotaženн šroubů dělнсн roviny tělesa . § Montбž kompenzбtorů a membrбnovэch pojistek na vнko NT vnějšнho tělesa. § Zavezenн vнk vnitřnнch těles a nosičů ST tělesa § Montбž vнk vnějšнch těles včetně dotaženн šroubů dělнch rovin těles. UPOZORNĚNH: Nнže popsanй montбžnн operace provбdějte až po provedenн zбlivky a po konečnйm vyrovnбnн TG nejdřнve 2 měsнce před najнžděnнm turbiny na otбčky (tvarovбnн betonovйho zбkladu). · Odměřenн skutečnэch rozměrů pro opracovбnн distančnнch podložek vэškovйho a stranovйho uloženн vnitřnнho NT tělesa ve vnějšнm . · Opracovбnн podložek dle nбměrů. · Vэměna montбžnнch podložek za aktivnн.
· Provedenн fixačnнch svarů některэch dнlů. 14) Dokončenн opracovбnн děr pro spojkovй coupling bolts and accurate alignment of rotor sґ catenary § Modification of the alignment of rotorsґ catenary (turbine, generator) due the completion of machining of holes for coupling bolts. § Completion of machining of holes for coupling bolts, releasing of rotors in couplings. § Precise alignment of rotorsґ catenary to the operational condition. The spring supports of condenser and top foundation slab (if exist) remain arrested. Notice:
This work can be done anytime during the turbine assembly before the final rotorsґ connecting in couplings and before the final alignment of components in the steam flow path. But it is recommended to complete the machining before the oil system flushing (the chips and impurities come into the bearing stands), possibly carry out it just before the embedding of pedestals into grout (easy change of rotorsґ position, precise alignment of rotorsґ catenary has not been completed šrouby a přesnй vyrovnбnн rotorovй soustavy před zбlivkou. § Ъprava vyrovnбnн rotorovй soustavy (turbina, generбtor) za ъčelem dokončenн opracovбnн děr pro spojkovй šrouby.
§ Dokončenн opracovбnн děr pro spojkovй šrouby, uvolněnн rotorů ve spojkбch. § Přesnй vyrovnбnн rotorovй soustavy na provoz nн stav. Pružinovй podpěry kondezбtoru a hornн zбkladovй desky (existujн -li) zůstбvajн zaaretovбny. Poznбmka: Tato operace může bэt provedena kdykoli během montбže turbiny před finбlnнm sespojkovбnнm rotorů a finбlnнm vyrovnбnн dнlů v parnн průtočnй čбsti. Je však doporučeno provйst opracovбnн před proplachem olejovйho systйmu (do ložiskovэch stojanů vnikajн při obrбběnн třнsky a nečistoty), přнpadně ještě před zбlivkou kozlнků do betonu (snadnб změna polohy rotorů, nenн dokončeno přesnй vyrovnбnн). Date: 12.11.2013 Page 110 / 278 Prepared: O.Baroch Last Revision:
Approved: P.Lešetickэ