DOOSAN ŠKODA POWER — DOOSAN ŠKODA POWER Steam Turbine Assembly Manual

Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika bearing stands, bushing of sensors sealing, etc.) 18) Proceeding of purge processes on turbine · Disconnecting piping of lubrication & jacking oil system from bearing stands, disconnecting piping of HP hydraulic control system from servomotors and aggregate, assembly of flushing provisory § Carrying out of purge procedures on lubrication & jacking oil and HP hydraulic control system including evaluation.

§ Dismantling of provisory of lubrication & jacking oil and HP hydraulic control system and change of flushing filling instead operation filling § Carrying out of chemical cleaning and blowing trough of the steam inlet piping to the stop valves bodies, evaluation of blowing through result, check the purity by endoscope 19) Completion of assembly and preparation of potrubн kolem ložiskovэch stojanů , zatěsněnн průchodek čidel , atd.). 18) Vykonбnн čistнcнch operacн na turbině § Odpojenн potrubн systйmu mazacнho & zvedacнho oleje od ložiskovэch stojanů, odpojenн potrubн systйmu hydraulickй regulace (VTH) od servopohonů a agregбtu, montбž provizoriн proplachu.

§ Vykonбnн čistнcнch operacн na systйmu mazacнho & zvedacнho oleje a VTH včetně vyhodnocenн. § Demontбž provizoriн na systйmu mazacнho & zvedacнho oleje a VTH a vэměna proplachovacн nбplně za provoznн.

§ Provedenн chemickйho čištěnн a profuku potrubн přнvodu pбry do těles RZ ventilů , vyhodnocenн vэsledků profuku, kontrola čistoty endoskopem 19) Dokončenн montбže a přнprava turbiny turbine for mechanical run on turning gear § Connecting of piping of lubrication & jacking oil on the bearing stands and inside the stands § Connection of piping of HP hydraulic control system to the aggregate and servomotors (when the blowing through and endoscopic checks are done) § Removing of in-built internals from stop valves, assembly of inner parts and putting valves into the operation state.

§ Setting of the working characteristic of turbine valves (valves, flaps, control orifices) § Mechanical setting of sensors of instrumentation (position against the object of measurement), adjustment and testing of signal converters, setting of the initial state (zero) in the electronic turbine control system. § Turning gear assembly and testing. § Carry out of the record about mutual position of turbine and generator towards upper and bottom foundation slab and altitude reference point of machine hall by very precise leveling (VPL) na mechanickэ chod na natбčedle § Připojenн potrubн mazacнho & zvedacнho oleje na ložiskovй stojany a uvnitř stojanů.

§ Připojenн potrubн VTH na agregбt a servopohony (po ukončenн profuku a endoskopickэch kontrol) § Vyjmutн vestaveb RZ ventilů, montбž vnitřnнch dнlů a uvedenн ventilů na provoznн stav § Seřнzenн pracovnн charakteristiky armatur turbiny (ventily, klapky, regulačnн clony). § Mechanickй nastavenн čidel měřenн (p oloha vůči objektu měřenн), nastavenн a odzkoušenн převodnнků signбlu, nastavenн vэchozнho stavu (nuly) v elektronickйm řнdнснm systйmu turbiny. § Montбž natбčedla a jeho odzkoušenн § Provedenн zбznamu vzбjemnй polohy turbiny a generбtoru vůči hornн a spodnн z бkladovй desce a nezбvislйmu bodu strojovny metodou velmi přesnй nivelace (VPN). Date: 12.11.2013 Page 112 / 278 Prepared:

O.Baroch Last Revision: Approved: P.Lešetickэ § Creating of workplace for clean of screens and filters including OHS, FP, EP measures adequate for carrying out of purge procedures (stop buttons, means for collection and liquidation of oil in case of leakage, material extinguishers). § Instalace pracoviště pro čištění sít a filtrů, zavedení opatření BOZP, PO, Ekologie přiměřeně pro vykonání čistících operací (stop tlačítka, prostředky pro sběr a likvidaci oleje v případě úniku, věcné hasící prostředky).