DOOSAN ŠKODA POWER — DOOSAN ŠKODA POWER Steam Turbine Assembly Manual

Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika well as the assembled outer cover of LP outer casing are specified in chapter 2.5. uvedena v kapitole 2.5. Preparing of components of the outer LP casing for assembly:

inspection of the conditions after transportation, beveling of outer edges for tightness-welds 5x45° and remov ing of the painting from the surface around the weld connection (only for vertical parting plane of cover LP outer casing), washing off the preservation and check of the contact surfaces, cleaning of threaded holes by screw tap, cleaning of holes for pins, greasing of threads by anti- sizing compound with min. temperature resistance of 120°C . First of all apply the sliding varnish Molykote D321R and then greasing paste Molykote Rapid+ on the sliding contact surfaces of the walls which are in contact with pedestals. Work Status: The parts of outer casing are prepared for assembly.

Přнprava dнlů NT vnějšнho tělesa pro montбž: prohlнdka stavu po dopravě, naъkosovбnн vnějšнch hran pro těsnнcн svary 5x45° a odstraněnн nбtěru z okolн svarovйho spoje (pouze u vertikбlnнch dělнcнch rovin dнlů vнka tělesa), smytн konzervace a kontrola stavu dosedacнch ploch, pročištěnн zбvitovэch děr zбvitnнkem, pročištěnн děr pro kolнky, promazбnн zбvitů mazacн pastou s teplotnн odolnostн min. 120°C . Na dosedacн kluznй plochy stěn s kozlнky včetně drбžek pro pera nanйst nejprve kluznэ lak Molykote D321R a pak mazacн pastu Molykote G Rapid+ . Stav pracн: Dнly vnějšнho těles a jsou připraveny pro montбž. LP casing bottom part: Spodek NT tělesa:

Creation of turning place = providing of the safe space for turning components while they are fully hung on the main and the auxiliary lift of overhead crane of machine hall Clean up the seating surfaces of the bottom parts of LP casing from preservation, hang the bottom part of LP casing on craneґs hook and put it on the supports.

Check the bottom part sitting down on the supports by blue-paint matching (the casing has to sitting down completely on the all supports, the local distance must not exceed 0,05 mm measured by gap gauges) First apply the sliding lack Molykote D321R and Vytvořenн obra c iště = zabezpečenэ prostor pro otбčenн komponent při zavěšenн na hlavnн a pomocnэ zdvih mostovйho jeřбbu strojovny Očistěte dosedacн plochy patek spodků NT čбsti tělesa (včetně drбžek pro pera), zavěste postupně spodky NT čбsti tělesa na jeřбb a položte jej na kozlнky. Kontrolujte dosedбnн spodku tělesa s kozlнky na barvu (těleso musн dosedat plně na všechny kozlнky, max.

lokбlnн vůle by neměla překročit 0,05 mm měřeno spбroměrkou) Na styčnй (kluznй) plochy spodku NT tělesa Date: 12.11.2013 Page 142 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ