Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika bottoms, check the proper contact in parting plane and than measure the bore shape (ovality) of all inner components. After measuring take out the upper parts and put them onto wooden supports. · Proceed the levelling by moving with whole bottom of LP casing according to values from the preassembly (Turbine Dozier book), take up the clearances of the temporary set- wedges and repeat the measurement.
The accuracy of position of the bottom part of LP inner casing has to be enough to avoid the touch of moving wheels with the honey-comb packing above the blade-bandages of diaphragms (the clearance on perimeter is 1,73 mm for diaphragm 1, 3,66 mm for diaphragm 2 and 5,37 mm for diaphragms 3. potй proměřte ovalitu vrtбnн všech vnitřnнch dнlů. Hornн dнly po odměřenн sejměte a umнstěte ven z tělesa na dřevěnй podklady. · Proveďte opravu vyrovnбnн pohybem celйho spodku NT tělesa podle hodnot z kontrolnн montбže (Pasport Turbнny), vymezte vůle montбžnнch stavěcнch klнnů a opakujte měřenн .
Přesnost polohy spodku NT vnitřnнho tělesa musн bэt takovб, aby nemohlo dojнt k dotyku oběžnэch kol s voštinovэm nadbandбžovэm těsněnнm rozvбděcнch kol po vloženн NT rotoru (obvodovб vůle je 1,73 mm u RK1, 3,66 mm u RK2, a 5,37 u RK3.) Demonstration picture of radial alignment of LP steam flow path elements with using of dummy shaft / Ilustračnн foto radiбlnнho vyrovnбnн dнlů průtočnй čбsti s použitнm kontrolnн hřнdele: vr · Take out the dummy shaft and insert LP rotor into bearings by means of the lifting beam according to drw. no. Tp6078811 . Obey all instructions for handling with rotor written above at the first alignment of rotorsґ catenary.
· Put LP rotor into the bearings (HP and IP turbine casing has been placed on position), carry out the measuring of alignment of LP rotor in coupling with dial gauges. · Correct the rotorsґ catenary alignment - if necessary. Align rotors for TG operation. · Then measure the rotor position against bores (measuring to the circular recesses for the oil sealing covers in the oil tank) and casings. Record all the values and compare them with data in Turbine Dozier Book (values measured · Vyjměte kontrolnн hřнdel a vložte NT rotor do ložisek pomocн zvedacн traverzy dle vэkresu Tp6078811 . Dodržte veškerй instrukce pro zachбzenн s rotorem, jak je popsбno vэše u prvnнho vyrovnбnн rotorovй soustavy.
· V ložte NT rotor do ložisek (VT a ST těleso turbiny je uloženo na pozici), proveďte měřenн vyrovnбnн NT rotoru ve spojce čнselnнkovэmi ъchylkoměry (hбčkovбnнm) . · Proveďte opravu vyrovnбnн rotorovй soustavy je- li potřeba. Provбdějte vyrovnбnн na provoz. · Potom p roměřte polohu rotorů vůči vэvrtům (měřenн na vэkružky pro olejovй vložky van) a těles. Veškerй hodnoty zaznamenejte a porovnejte s ъdaji v pasportu turbiny (hodnoty naměřenй při kontrolnн montбži v dнlně Date: 12.11.2013 Page 156 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ