Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika Note: In case that it is not possible to carry out the measurement by means of LP dummy shaft because of inacceptable inaccuracy (length and shaft stiffness) there will be used measuring laser system CENTRELIGN in combination with string measuring (measuring will be provided by subcontractor who provides the assembly). · If there was done any corrections of parts’ positioning setting, dismantle the diaphragms and clean out the inner LP casing by blowing with pressure air and put the parts back into bottom of inner casing. Work status:
Radial and axial alignment of inner components in LP steam flow path just before casing boxing up is completed. - - - - - - - - - - - - - - - - - - - - - - - - - ATTENTION: Poznбmka: V přнpadě, že nebude možnй provйst měřenн pomocн NT kontrolnн hřнdele z důvodu nepřijatelnй nepřesnosti (dйlka a tuhost hřнdele), bude pro měřenн použit měřнсн laserovэ systйm CENTRALIGN v kombinaci s měřenнm na strunu (měřenн zajistн subdodavatel provбdějнсн montбž). · Pokud byly provбděny korekce v ustavenн dнlů, demontujte rozvбděсн kola a vyčistěte vnitřnн NT těleso vyfoukбnнm stlačenэm vzduchem a vložte dнly zpět do spodku vnitřnнho tělesa. Stav pracн:
Radiбlnн vyrovnбnн vnнtřnнch dнlů NT průtočnй čбsti je dokončeno. - - - - - - - - - - - - - - - - - - - - - - - - - UPOZORNĚNH: V přнpadě, že by při pok lбdбnн dнlů turbiny na pozici byly zjištěny enormnн rozdнly v pružnй deformaci NT tělesa a ve vzбjemnй poloze ložiskovэch stojanů vůči NT tělesům (v porovnбnн s před - montбžн u vэrobce), je nutno provйst:
o naměřenн polohy statorovэch dнlů NT parnн průtočnй čбsti vůči NT rotoru metodou „Měřenн centr icity v zavřenйm stavu“ (instalace čidel na rotor, ъplnй zavřenн a otevřenн tělesa s rotorem uvnitř a průběžnй měřenн polohy rotoru ve statoru) o po vyjmutн NT rotoru korigovat ustavenн statorovэch dнlů podle vэsledku tohoto měřenн o provйst kontrolu sprбvnosti ustavenн metodou nбplastн (nalepit na rotor nбplastě, zavřнt těleso s rotorem uvnitř, protočit rotor, otevřнt těleso, vyjmout rotor) Uvedenй činnosti se na staveništi obvykle neprovбdн , je však nutno, aby subdodavatel zajišťujнcн provedenн montбžnнch pracн vzal v ъvahu možnost vэskytu popsanэch pracн .
Měřнсн přн s troje, montбžnн dozor pracн a vyhodnocenн měřenн by v takovйm přнpadě If a huge differences of flexible deformation of LP casing would be found as well as differences in mutual position of bearing stands and LP casings during the putting of turbine components on position (in comparison with the pre-assembly at producer), it would be necessary to carry out:
o Measurement of position of stator parts of LP steam flow path against the rotor by procedure “Measuring af concentrity in closed state” (installation of sensors on rotor, complete boxing up & opening of casing with rotor inside and continuos measuring of the rotor position in stator) o After LP rotor taking out to correct the position of stator parts according to the reasult of measurement o Carry out the check of the rightness of position setting by means of plasters (stick the plasters on rotor, box up the casing with rotor inside, turn the rotor, open the casing, take the rotor out) Above described activities are not usually done on site, but it is necessary that the sub-contractor who provides the site assembly works takes in account the posibility of arising of described works.
Measure instruments, supervision of works and evaluation of the measurement would be Date: 12.11.2013 Page 158 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ