Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika instruction Q159150 · Preparation on IP turbine casing closing · Take the rotor out of turbine casing and check the cleaness of the casing inside again · Check if thermal sensors of inner casings parts are mounted acc. to drawing Tp6076453 · Insert IP rotor and record set up of gaps in IP steam flow parts of steam turbine.
Meassurement and record will be set up only by specialist for quality from DSPW · Check if the laying of the anti-friction coating is not damaged (the threads of screws, threads and face surfaces of nuts, contact surfaces for the nuts on the covers of casings and carriers. Notice: The screws and places where the antifriction coating has to be applied are described in the drawings of turbine casings. If the antifriction coating surface is damaged, repair the layer (decreasing with Technosol, apply the anti-friction coating Molycote D321 R, let the layer to get dry. · Apply the anti-size compound Molykote G Rapid+ to all surfaces of future friction.
· Put the turbine rotor in · Přнprava na zavřenн ST tělesa turbiny: · Vyjměte rotor a zkontrolujte opět čistotu celйho vnitřnнho prostoru tělesa turbiny. · Zkontrolujte zda jsou namontovбna čidla měřenн teploty vnitřnнch těles dle vэkresu č. Tp6076453 . · Vložte ST rotor a za protokolujte nastavenн vůlн ve ST průtočnй čбsti parnн turbiny. Měřenн provede a protokol vystavн vэhradně specialista pro Jakost ze DSPW. · Zkontrolujte zda nenн porušena vrstva kluznйho laku na zбvitech šroubů, zбvitech a čelech matic, na dosedacнch plochбch pro matice na vнkбch těles a nosičů. Pozn.: Šrouby a mнsta pro aplikaci kluznйho laku jsou vždy konkrйtně předepsбna na vэkresech (seznam viz tabulka nнže).
V přнpadě poškozenн, vrstvu kluznйho laku opravte (nejprve odmastit Technosolem), nanйst novэ kluznэ lak Mol ykote D321R, nechat zaschnout). · Doplňte mazacн pastu Molykote G Rapid+ na všechny třecн plochy nebo zбvitovй konce. · Vložte rotor do turbiny Closing up of the turbine casing: General conditions applying to turbine casing boxing up: Ш At the time of the machine closing, use maximum caution when handling the components and tools over the open machine. Ш Restrict the number of employees present in the vicinity of the open machine as much as possible. Ш The usual practice for the employee about to enter the open machine is to remove all metal articles from their pockets.
Ш Cover and secure all steam piping inlets and centre pin holes on the upper parts before they are installed. Ш Remove all covers of the holes in the bottom part of the casing just before you start with the installation of the upper part components. Ш Cover the bottom of casing by the canvas in case of the work interruption . Zavřenн těles parnн turbiny: Všeobecnй podmнnky při zavнrбnн stroje:
Ш Během zavнrбnн stroje dodržovat maximбlnн opatrnost při manipulaci s dнlci a nбstroji nad otevřenэm strojem Ш Omezit na minimum počet pracovnнků, pohybujнcнch se na otevřenйm stroji Ш Pracovnнci vstupujнcн na otevřenэ stroj si dle zvyklostн odklбdajн před vstupem všechny kovovй předměty z kapes Ш Na svrškovэch čбstech před jejich montбžн důsledně zakrэt a zajistit vstupy pro parovody a středicн čepy. Ш Kryty otvorů ve spodnн čбsti tělesa odstranit až těsně před montбžн svrškovэch dнlců. Ш Při přerušenн pracн je nutno zakrэt spodek plachtou. Date: 12.11.2013 Page 175 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ