Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika · Assemble gland cover, washersand nuts of parting plane bolts. Tigthen nuts by checked torque moment in cold acc. to table below. · Top of diaphargms assembly are attached in cover of inner casing. · Cover of IP inner casing and carriers assembly. Outer contact surface of inner casing and gland bodies grease by grease Molykote G Rapid+. Washers and nuts assembly onto parting plane bolts of inner casing. Nuts tigthened by checked torque moment in cold acc. to table below. After nuts tighten, adjusting bolts, pins and guide pins dismantling from parting plane.
· Cover of IP outer casing assembly. Washers and nuts on parting plane bolts. Nuts tigthened by checked torque moment in cold acc. Apendix no.2. After nuts tighten, adjusting bolts, pins and guide pins dismantling from parting plane. · Parting plane bolts of casings tighten always from steam inlet direction to glands. Simultaneously two tighten head tighten on opoposite side of flange during cold tightening. · Montujte vнka ucpбvek, podložky a matice šroubů dělнсн roviny. Utahujte matice kontrolovanэm kroutнcнm momentem za studena dle nнže uvedenй tabulky. · Montujte svršky rozvбděcнch kol jsou upevněny ve svršcнch (vнka) vnitřnнch těles. · Montujte vнko vnitřnнho ST tělesa a nosičů.
Namažte vnějšн dosedacн plochy vnitřnнch těles a těles ucpбvek pastou Molykote G Rapid+. Montujte podložky a matice na šrouby dělнcнch rovin vnitřnнch těles. Utahujte matice kontrolovanэm kroutнcнm momentem za studena dle nнže uvedenй tabulky. Po utaženн matic demontujte stavěсн šrouby, kolнky a vodнcн svнčky z dělнсн roviny. · Montujte vнko vnějšнho ST tělesa. Montujte podložky a matice na šrouby dělнсн roviny. Utahujte matice šroubů kontrolovanэm kroutнcнm momentem za studena dle přнlohy čнslo .2 Po utaženн matic demontujte stavěсн šrouby, kolнky a vodнcн svнčky z dělнсн roviny. · Šrouby dělнcнch rovin těles utahujte vždy od mнst vstupu pбry směrem k ucpбvkбm.
Utahujte současně dvěmi utahovacнmi hlavami na protějšнch stranбch přнruby při utahovбnн za studena. The casing HP turbine in closed form weighs 65 tons , transporting stand weighs 5,2 tons (drawing no. Tp6077357 ) overall weight is 70,2 tons . The 4 pcs of textile endless belts with loading capacity 25 000kg each are delivered for handling with the casing as drawn in drw. Tp6079138: pos.1 working length 3900 mm. The casing in closed form is always hung on ropes attached to the slinging risers on bottom part of turbine casing (it is valid also in case of handling with the casing locked inside the transporting stand). The textile endless belts are included in DSPW delivery.
Těleso VT turbнny v zavřenйm stavu тб hmotnost 65 tun , přepravnн stojan 5,2 tuny (vэkres Tp6077357 ) celkovб hmotnost 70,2 tuny . Pro manipulaci s tělesem jsou dodбny 4 textilnн nekonečnй pбsy každэ s nosnostн 25 000 kg na vэkrese Tp6079138 : poz.1 . pracovnн dйlka 3900 mm . Textilnн nekonečnй pбsy se při ma nipulaci s tělesem v zavřenйm stavu upevňujн vždy za nбlitky spodku tělesa turbiny (toto platн i v přнpadě manipulace tělesa s přepravnнm stojanem). Textilnн nekonečnй pбsy jsou součбstн dodбvky DSPW. Date: 12.11.2013 Page 176 / 278 Prepared: O.Baroch Last Revision: Approved:
P.Lešetickэ 2.11.4 Assembly of the turbine HP casing delivered in closed form / Montáž VT tělesa turbíny dodaného v uzavřeném stavu