Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika accoding to the instructions of the DSPW technical advisor (Specialist for turbine assembly). The drawing radial side clearances in steam flow path are the following: on circumference of moving wheels under the shrouding sealing in HP turbine casing is min. 0,45 mm, in IP turbine casing is min. 0,55 mm and in LP turbine casing it is min. 1,7 mm, the clearance in the shaft glands in HP and IP turbine casing is min. 0,5 mm and in LP turbine casing it is min. 0,7 mm.
· It is profitable to carry out the alignment of the rotor’s catenary into the deflection curve in tollerances for opration just before setting of the steam flow path of turbine. · Initially it is necessary to carry out the alignment of the rotors in prescribed tollerances for purpose of the machining completion of of the holes for the coupling bolts (it is differs from the alignment for the operation). Completion of machining of the holes for coupling bolts can be done whenever it is suitable and for each coupling separately. This activity has to be complete just before the lub&jacking oil system flushing which is linked to the activities inside of the bearing stands.
· It is recommended to carry out the coupling connectionof rotors catenary after loading of foundation with the determinative weights, when any significant change of foundation shape is not probable. The coupling connecting cannot be done earlier then 2 months before planned commissioning on turns. It is possible to carry out the preliminary coupling connecting on 4 or 6 bolts in each coupling for the purpose of turning with the rotors catenary by turning gear (the flushing of the oil system has to be complete). · The connecting of the rotors in purpose of turining with the rotors catenary it is also possible to carry out by means of pin delivered in set according to drw. no.
Tp6073321 (turning with the rotors catenary by means of crane during measuring of alignment) or by means of the coupling bolts with reduce diameter (fixation of coupling for the completion of machining of holes for the coupling bolts) or by reduce number of the coupling bolts (turning with the rotors catenary by turning gear for the purpose of stranovй vůle v parnн průtočnй čбsti jsou nбsledujнcн: na obvodu oběžnэch kol pod nadbandбžovэm těsněnн m na VT tělese je min. 0,45 mm, na ST tělese je m in. 0,55 mm a na NT tělese je min. 1,7 mm, vůle v hřнdelovэch ucpбvkбch jsou na VT a ST dнlu turbiny min. 0,5 mm a na NT dнlu min. 0,7 mm.
· Před vyrovnбnнm parnн průtočnй čбsti turb нny je vэhodnй provйst vyrovnбnн rotorovй soustavy do průhybovky v tolerancнch na provoz. · Za ъčelem dokončenн opracovбnн děr pro spojkovй šrouby je nezbytnй provйst nejprve vyrovnбnн rotorů v předepsanэch tolerancнch (lišн se od vyrovnбnн na provoz). Dokončenн opracovбnн děr pro spojkovй šrouby je možnй provбdět v každй spojce zvlбšť kdykoli je to vhodnй. Tato činnost musн bэt ukončena před proplachem systйmu mazacнho & zvedacнho oleje, kterэ je spojen s činnostн uvnitř ložiskovэch stojanů.
· Spojkovбnн rotorovй soustavy je doporučeno provбdět až po zatнženн zбkladu rozhodujнcн mi hmotnostimi, kdy je již ne pravděpodobnй, že by došlo k vэraznй změně tvaru zбkladu. Spojkovбnн se neprovбdн dřнve než 2 měsнce před plбnovбnэm najetнm turbosoustrojн na otбčky. Za ъčelem otočenн rotorou soustavou natбčedlem je možno provйst předběžnй sespojkovбnн na 4 a 6 šroubů v každй spojce (podmнnkou je ukončenэ proplach olejovйho sytйmu ).
· Spojovбnн rotorů za ъčelem otбčenн rotorovou soustavou lze provйst pomocн čepů dodanэch v sadě dle vэkresu Tp6073321 (otбčenн rotorovou soustavou jeřбbem při měřenн vyrovnбnн), nebo pomocн spojkovэch šroubů s redukovanэm průměrem (fixace spojek pro dokončenн opracovбnн děr pro spojkovй šrouby) nebo pomocн redukovanйho počtu spojkovэch šroubů (otбčenн rotorovou soustavou natбčedlem po provedenн proplachu systйmu mazacнho & zvedacнho oleje za Date: 12.11.2013 Page 188 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ