Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika measuring after the completion of the lub&jacking oil system flushing, turning with rotors during purge procedures and tests on devices related the turbine). Turbine casing · First of all carry out the setting of horizontal parting plane of LP casing of the turbine 210 MW BANDEL MW onto level of the turbine rotorsґ turning axis at level +9,920 m . · The setting of LP bearings and setting of the other bearings into rotors deflection curve is based on the setting of the LP casing.
Position of HP and IP turbine casing will be subsequently set according to the deflection curve of rotors catenary. · It is possible to carry out the assembly of the piping up to the nozzles on the bottom parts of casing after the rought axial and radial setting of the bottom parts of turbine casing however always without the connecting and hanging of the piping to the casings! · After the aligning of the rotors into the deflection curve and after preliminary alignment of steam flow path of turbine, it is occasionally necessary to carry out the boxing up of casing in the purpose of the measuring of changes in the centricity of stator elements against dummy shaft during this process.
This happen in case of expressive influence of the concrete foundation at the site to flexible deformation of turbine components in comparison with the steel foundation at the workshop of producer. After the assembly of the cover of casing during above mentioned measurement, it is possible to carry out the assembly of cross-over piping between the valve bodies and covers of turbine casings without connecting of any piping to the bottom part of casing. · The piping and the superctructure coat of the condenser can be connected to the bottom part of turbine casing only when the final boxing up of the turbine casing is completed.
· It is not allowed to carry out the embedding of the pedestals of turbine and bearings stands into grout until the connecting of the piping DN > 150 and welding of the supestructure coat of condenser to the turbine casing are not done. · The placing of the LP inner casing inside the LP outer casing is designed so it would be ъčelem měřenн, otбčenн rotory při provбděnн čistнcнch operacн a zkoušek na zařнzenнch souvisejнcнch s turbinou). Tělesa turbн ny: · Na turbině pro 210 MW BANDEL se nejprve provede usta venн NT tělesa dělнсн rovinou vodorovně na ъroveň osy rotace rotorů turbiny na +9,920 m .
· Od ustavenн NT tělesa se odvнjн ustavenн NT ložisek a ustavenн ostatnнch ložisek do průhybovky rotorovй soustavy. Podle průhybovky rotorovй soustavy bude nбsledně ustaveno VT a ST těleso turbiny. · Po hrubйm radiбlnнm a axiбlnнm ustavenн spodků těles tu r biny je možno provбdět montбž potrubн k hrdlům spodků těles – vždy však bez připojovбnн a zavěšovбnн potrubн k tělesům! · Po vyrovnбnн soustavy rotorů do průhybovky a předběžnйm vyrovnбnн parnн průtočnй čбsti turbiny je někdy nutno provйst zavнrбnн těles a za ъčelem naměřenн změn centricity statorovэch dнlů na kontrolnн hřнdel během tohoto procesu.
Dochбzн k tomu v přнpadě vэraznйho vlivu betonovйho zбkladu na staveništi na tvar pružnй deformace dнlů turbiny v porovnбnн s dнlenskэm ocelovэm zбkladem při kontrolnн montбži u vэrobce. Po zavřenн vнk a těles a během vэše zmнněnйho měřenн, je možnй provйst montбž převбděcнho potrubн mezi těles y ventilů a těles em turbiny na vнka turbнnovйho těles a bez připojovбnн potrubн ke spodku těles. · Po finбlnнm zavřenн těles a turbiny je teprve možno provйst připojenн potrubн a nбstavby kondenzбtoru ke spodk u těles a turbiny. · Dokud nenн provedeno připojenн potrubн DN > 150mm a přivařena nбstavba kondenzбtoru k tělesům turbiny nenн povoleno provйst zбlivku kozlнků těles a ložiskovэch stojanů.
· NT vnitřnн těleso je uloženo v NT vnějšнm Date: 12.11.2013 Page 189 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ