Instructions for ST assembly 210 MW Bandel India Document number: S12003-YK09-05MAA-747002 Tylova 57l 31600 Plzeň l Českб Republika deformation of turbine casing and the stator parts setting against the rotors by the measuring method of very pecise levelling VPL (original position has to be measured in advance). The weld-connecting of pipelines to the turbine casing sockets and connecting of flange of condenser neck have to be completed including NDT of welds just before the embedding of pedestals into grout . přesnй ni velace VPN (referenčnн měřenн původnн polohy dнlů musн bэt provedeno předem).
Kompletnн přivařenн potrubн k hrdlům tělesa turbiny a připojenн přнruby nбstavby kondenzбtoru včetně defektoskopickэch kontrol svarů musн bэt dokončeno ještě před zбlivkou kozlнků do betonu . Cross over piping IP steam inlet piping: The pipe has to be welded to the nozzle adapters of IP turbine casing after the setting & fixing of turbine casing and valve’s bodies on position. The bottom nozzle adapters are already welded to the bottom part of IP outer turbine casing from the manufacturer. The upper nozzle adapter Tp6076111 for the steam inlet from the valve placed on the right side of turbine is connected to the cover of IP turbine casing through the flange.
· Assemble HP piping from the pre-fabricated parts including the connecting flanges pos.3 and lock the mutual position of individual parts by means of the tack-welding of splices. Put the inserts instead of the original gasket pos.8 (SWG-IOR) (cut the inserts from IT sheet into the flange, the same thickness as the gasket). Weld the piping with respect to arising of minimum deformation, protect the root of weld from inside & outside of tube by Argon during the welding, pre-heat and keep temperature in the place of weld at 200- 250°C, carry out the weld annealing after welding at temperature of 680- 720°C , check the on-site welds by X-Ray and capillary test, carry out the hardness test.
· At the end remove the upper cross-over tube, check the conditions and purity of inside space by means of the endoscope and make report about. · Check the free-passing of the drainage sockets. If any impurities are found inside, there is possible to use the cleaning by pressure water, the upper cross-over tube can be cleaned mechanically. Have the length of tube-sections measured between the check points and make report about (the tube material creep is evaluated in future on base of this recorded values). · Install the gasket pos.8 ; apply the sliding varnish Molykote D321R and the anti-sizing Převбděсн potrubн ST:
Potrubн je nutno po ustavenн tě les ST RZR ventil ů a ST t ě lesa turbiny na pozici p ř iva ř it k dэzovэm nбstavcům. Dэzovй nбstavce spodku t ě lesa jsou p ř iva ř eny ke spodku ST vnějšнho t ě lesa od vэrobce. Hornн dэzovй nбstavc e Tp6076111 pro p řнvod pбry z ventilu na pravй straně turbiny je namontovбn na vнko ST t ě lesa p ř es p řнrubu. · Sestavte S T potrubн z prefabrikovanэch dнlů v č etn ě spojovacн p řнruby poz.3 a zafixujte polohu jednotliv эch dнlů p řistehovбnнm přнložek. Do spojovacн přнruby vložte namнsto t ě sn ěnн poz.8 (SWG- IOR) vložku z IT desky o stejnй tloušť ce.
Sva řujte potrubн s ohledem na vznik minimбlnн deformace, ochrana argonem zevnit ř i vn ě trubky během svařovбnн , p ř edeh ř ejte a temperujte oblast svar ů p ř i sva řovбnн na 200- 250°C , prove ďte vyžнhбnн svar ů p ř i teplot ě 680- 72 0°C , prove ď te kontrolu montбžnнch svarů prozбřenнm a kapilбrnн zkoušku, proveď te kontrolu tvrdosti. · Na zбvě r sejm ěte hornн parovod, prove ď te prohlнdku stavu a čistoty vnit řnнho prostoru endoskopem a vystavte protokol. · Kontrolujte průchodnost nбtrubků odvodněnн. V přнpadě nalezenн nečistot je možnй využнt čištěnн tlakovou vodou, hornн převбděсн rouru je možnй vyč istit mechanicky.
Nechte proměřit dйlky potrubн v kontrolnнch bodech a vystavte p rotokol (zбznam pro vyhodnocenн tečenн materiбlu za provozu). · Instalujte těsněnн poz.8 , naneste na šrouby a čela matic kluznэ lak Molykote D321 R a Date: 12.11.2013 Page 233 / 278 Prepared: O.Baroch Last Revision: Approved: P.Lešetickэ