MAINTENANCE 4 B. ATTACHMENT MAKE SURE BUCKET IS WARNING STABLE ON THE GROUND WEAR GOGGLES, SAFETY SHOES, HARD HAT, WORK CLOTHES AND WORK GLOVES TO PER- FORM INSPECTION AND MAINTENANCE ON THIS MACHINE. 1. Bucket/Arm & Link Clearance Frequently, check clearance between bucket and bucket link and/or between arm and bucket to make sure it is within specifications. If clear- FIGURE 4.54A ance is greater than 1.2 mm (0.05”) adjust clear- ance. Proceed as follows to correct excessive play: a. Move the machine to a firm level surface and place the bucket on the ground, making cer- tain that the bucket is stable. See Figure 4.54A. b. Roll “O”-Rings onto the bucket bosses. See Figure 4.54B. c.
Remove jam nuts, nuts, and retaining bolt. See Figure 4.54B. JAM NUT RETAINING BOLT d. Carefully slide out, partially, main pins mount- ROLL “O”-RING ON BOSS ing arm and bucket link to bucket. You may have to start the engine and slightly operate FIGURE 4.54B the boom and arm to remove load from pins. See Figure 4.54C. Slide out pin half way e. Insert shims as needed to correct any ex- cessive play. f. Align the shims with pin holes and insert pins into position. Be careful not to damage seals. g. Install retaining bolt with nut and jam nut. See Figure 4.54B. h. Roll “O”-Rings onto the grooves between bucket/arm, and bucket/bucket link. See Fig- ure 4.54D.
NOTE Inspect “O”-Rings for damage or excessive wear. If worn FIGURE 4.54C or damaged replace with new parts to protect seals, pins and surfaces from dirt and debris which can cause pre- mature failure. (FOR SK210(LC)-VI) “O”-Ring Part Number (4 Required) 2445Z1136 (FOR SK250(LC)-VI, SK250NLC-VI) ROLL “O”-RING “O”-Ring Part Number (4 Required) ON GROOVE LQ61B01004P1 FIGURE 4.54D Slide out pin half way FIGURE 4 .54C ROLL “O”-RING ON GROOVE FIGURE 4.54D 4-54 SK210(LC)/SK250(LC)–VI Dynamic Acera OM, 09/00 Rev.2