MAINTENANCE 2. Reversing Bucket a. Move the machine to a firm level surface and place the bucket on the ground, mak- ing certain that the bucket is stable. See Fig- ure 4.55A. MAKE SURE BUCKET IS STABLE ON THE GROUND b. Roll “O”-Rings onto the bucket bosses. See Figure 4.55B. c. Remove jam nuts, nuts, and retaining bolts from both pins. See Figure 4.55B. d. Carefully slide out main pins mounting arm and bucket link to bucket. FIGURE 4.55A NOTE You may have to start the engine and slightly operate the boom and arm to remove load from pins. e. Clean pins and pin holes, and apply grease on pin and holes surfaces. 4 f. Rotate bucket 180є or move machine.

Install arm and bucket link in their respective posi- tions. See Figure 4.55C. g. Move the bucket cylinder to match the bucket pin holes with the bucket link hole. Insert pin. Becareful not to damage seals. RETAINING BOLT JAM NUT h. Operate the boom and arm to match the bucket pin holes with the arm hole connec- tion. Insert pin carefully to avoid damaging the seals. FIGURE 4.55B i. Install retaining bolts with nuts and jam nuts on both pins. See Figure 4.55B. j. Roll “O”-Rings onto the grooves between bucket/arm, and bucket/bucket link. See Fig- ure 4.55B.

CAUTION INSTALL ARM HERE FOR BACK HOE BUCKET OPERATION Slowly cycle bucket, check for interference with arm, particularly if a lifting eye is welded on bucket bottom. Be careful not to confuse the bucket shoveling operation with that of the backhoe. Check clearance between bucket and cab before op- eration. Exercise care when operating the bucket near the cab. INSTALL ARM HERE FOR FRONT BUCKET OPERATION FIGURE 4.55C SK210(LC)/SK250(LC)–VI Dynamic Acera OM, 09/00 Rev.2 4-55 RO LL “O”-RING ON BOSS