MAINTENANCE 3. Removing the Bucket a. Move the machine to a firm level surface and place the bucket on the ground, making cer- tain that the bucket is stable. See Figure 4.56A. 4. Installing the Bucket a. Make certain that the bucket is stable on firm level ground. b. Install “O”-Rings onto the bucket bosses. c. Clean pins and pin holes, and apply grease on pin and holes surfaces. d. Move the bucket cylinder to match the bucket pin holes with the bucket link hole. Insert pin. Be careful not to damage seals. See Figure 4.56D MAKE SURE BUCKET IS STABLE ON THE GROUND Install bucket link first FIGURE 4.56A b. Roll “O”-Rings onto the bucket bosses. See Figure 4.56B. 4 FIGURE 4.56D e.
Operate the boom and arm (7) to match the bucket (6) pin holes with the arm hole con- nection. Insert pin (5) carefully to avoid dam- aging the seals. See Figure 4.56E FIGURE 4.56B c. Remove jam nuts, nuts, and retaining bolt. See Figure 4.56B. d. Carefully remove main pins mounting arm and bucket link to bucket. You may have to start the engine and slightly operate the boom and arm to remove load from pins. See Figure 4.56C. Be careful not to damage dust seals. FIGURE 4.56E Slide out pins ure 4.56F. h. Apply sufficient grease to the bucket pin con- nections.
FIGURE 4.56C 4-56 SK210(LC)/SK250(LC)–VI Dynamic Acera OM, 09/00 Rev.2 “O”-RING N BOSS JAM NUT RETAINING BOLT ROLL O “O” N BO JA M NUT f. Install retaining on both pins. S b e olts with n e Figure 4 uts and jam nuts .56F. ROLL “O”-RING ON GROOVE Install retaining bolts, nuts and jam nuts Inst FIGURE 4.56F g. Roll “O”-Rings onto the grooves between bucket/arm, and bucket/bucket link. See Fig-