Doosan DX225LC-3 — Machine Without a Boom Lowering Control Valve

3. Open the oil tank cover. 4. Connect an end of hose (2, Figure 143) to screw of poppet (3, Figure 143). 5. Slowly loosen screw of poppet (3, Figure 143) by 4 - 5 turns. This allows the hydraulic oil in the boom circuit to drain into the hydraulic tank. The boom will now start to lower. FG020063 Figure 142 NOTE: Refer to “Disposal of Hazardous Materials” on page 1-74 for information on containing fluid spillage. 1 WARNING AVOID DEATH OR SERIOUS INJURY To prevent rapid boom lowering, slowly loosen poppet screw. 3 6. Make sure that work tool has lowered all the way to the ground. Tighten screw of poppet (3, Figure 143) to a torque of 0.2 kg m (1.96 Nm, 1.45 ft lb). 2 FG020093 7.

Disconnect hose (2, Figure 143) from screw of poppet (3, Figure 143). Do not allow the oil that is contained in hose (2, Figure 143) to spill. Figure 143 8. Connect hose (2, Figure 143) to the original position on the hydraulic tank and install the oil tank cover (1, Figure 143). After completion of the manual boom lowering, make necessary repairs before you operate the machine again. NOTE: For additional information, contact your DOOSAN distributor. Operation 3-75 DX225LC-3