Installation Procedure The installation, procedure is the reverse of the removal procedure Note: Supply MP grease through the king pin grease fitting. The tightening torque for each portion is as follows: Unit: I King pin lock N-m (kg - cm) [ft-lbl bolt,lock nut 1 19.61 - 31.38 (200- 320) [I 4.47 - 23.151 I 0 [21.71 - 32.561 2.3 ton Divided rim bolt set nut 1 ton series: 29.42 - 44.13 (300 - 450) series:49.03- 68.85 (500 - 700) [36.18- 50.651 1 ton series (Both divided rim and side ring rim): 88.26 - 156.9 (900 - 1600) - 11 5.761 2 ton series (divided rim): 117.68 - 196.13 (1200 - 2000) i65.12 Hub nut (Note) 2 ton series 6.50 - 10 - 10PR (I) tire (OPT):
117.68 - 196.13 I86.82- 144.701 2 ton series (side ring rim): 176.52 - 392.27 Ib-ftl for both divided rim and side ring rim N,m (1200 - 2000 kg - cm) [86.82- 144.70 [I 30.23 - 289.401 3 ton series (Both divided rim and side ring rim): 117.68 - 196.13 (1200 - 2000) (1 800 - 4000) i86.82-144.701 Make the chamfered side face the center Point Operations [Point 1 I Installation: In the case of a divided rim type wheel, install with the divided rim set bolt head on the outer side of the vehicle. Disassembly: When a wheel is removed for disassembly, always discharge air fully before disassem - bling the wheel. Reassembly:
The divided rim set bolt shall be installed with its head chamfered side facing the center of the wheel. [Point 21 Installation: Fill MP grease in the cap. Installation: Install by tapping the cap flange portion. [Point 31 Removal: SST 09950 - 2001 7 Tie rod end castle nut - - 1.2 ton series: 68.65 98.067 (700 1000) t50.65- -72 .351 - - [I 3 ton series: 147.10 196.13 (15 00 2000) 08.53 144.701