Point Operations [Point 1 I Removal: Hoist the inner mast (middle mast) and set the SST to the inner mast (middle mast) tie beam. SST 096 10 - 22000 - 7 1 Removal: Shim adjustment is made at the lift cylinder rod end to prevent uneven movements of the lift cylinders RH and LH. Take a note on which side the adjustment is made and the number of shims used. [Point 21 Installation: The cylinder support shall be tightened tem - porarily here and make shim adjustment after rod end connection. Adjustment: With the rod end connected, insert shims be - tween the cylinder support and outer mast to eliminate the clearance. The shim thickness shall be slightly on the thicker side.