UEN00228-00 30 Testing and adjusting 6. Adjust the valve clearance according to the fol- lowing procedure. 1) While fixing adjustment screw (3), loosen locknut (4). 2) Insert thickness gauge B2 in the clearance between rocker arm (5) and crosshead (6) and adjust the valve clearance with adjustment screw (3). a With the thickness gauge inserted, turn the adjustment screw to a degree that you can move the thickness gauge lightly. 3) While fixing adjustment screw (3), tighten locknut (4). 3 Locknut: 24 ± 4 Nm {2.45 ± 0.41 kgm} a After tightening the locknut, check the valve clearance again. 7.
Rotate the crankshaft forward by 1 turn and set wide slit (b) to projection top (a) according to step 4. 8. Adjust the other valve clearances according to steps (5) and (6). a If the valves marked with q in the valve arrangement drawing were adjusted in steps (5) and (6), adjust the valves marked with Q . a If the valves marked with Q in the valve arrangement drawing were adjusted in steps (5) and (6), adjust the valves marked with q . 9. After finishing adjustment, remove the adjust- ing tools and return the removed parts. k Remove gear B1 without fail. 3 Cylinder head cover mounting nut: 24 ± 4 Nm {2.45 ± 0.41 kgm} 10 PC210, 230, 240-8