Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Measuring compression pressure

UEN00228-00 30 Testing and adjusting 7. Disconnect CE03 connector (5) of the engine controller. 9. After finishing measurement, remove the mea- suring tools and return the removed parts. a Install the injector and inlet connector according to the following procedure. 1) Apply new engine oil (SAE15W-40) to the O-ring of injector (4) and cylinder head. 2) Install injector (4) with the fuel inlet hole directed to the air intake manifold. 3) Install injector clamp (6) and tighten the mounting bolt by 3 – 4 threads. 4) Install inlet connector (7) and tighten inlet connector retainer temporarily. 5) Tighten the mounting bolt of injector clamp (6) securely.

k If the connector is not disconnected, the engine will start during measure- ment and it will be dangerous. k Since the CE03 connector is a part of the power supply circuit of the engine controller, cover the connector on the machine side with a vinyl sheet, etc. to prevent electric leakage and ground fault. 3 Injector clamp mounting bolt: 1st time : 3.5 ± 0.35 Nm {0.36 ± 0.04 kgm} 2nd time: 75 ± 5 ° (Angle tightening) 6) Tighten inlet connector retainer (8) securely. 3 Inlet connector retainer: 50 ± 5 Nm {5.1 ± 0.5 kgm} 8. Rotate the engine with the starting motor and measure the compression pressure. a Read the gauge when the pointer is stabi- lized.

a Tighten the bolts and nuts other than the injector and inlet connector to the follow- ing torque. 3 Injector wiring harness nut: 1.5 ± 0.25 Nm {0.15 ± 0.026 kgm} 3 Fuel tube sleeve nut: 35 ± 3.5 Nm {3.6 ± 0.4 kgm} 3 Rocker arm assembly mounting bolt: 36 ± 6 Nm {3.7 ± 0.6 kgm} a Adjust the valve clearance. For details, see “Adjusting valve clearance”. 3 Cylinder head cover mounting nut: 24 ± 4 Nm {2.45 ± 0.41 kgm} 12 PC210, 230, 240-8