Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Checking parts which cause hydraulic drift of work equipment

30 Testing and adjusting UEN00228-00 3. Checking PPC valve While the pressure in the accumulator is high, set the lock lever in the LOCK/FREE position and measure the lowering distance. a Operate the control lever while the starting switch is in the ON position. a If the pressure in the accumulator is lost, run the engine for about 5 seconds to heighten the pressure in the accumulator. a If there is a difference in the lowering dis- tance between the LOCK position and FREE position, the PPC valve is defective (it has an internal defect). PC210, 230, 240-8 49