UEN00660-00 50 Disassembly and assembly q Carry out the following installation in the reverse order to removal. [*1] Install muffler (8) after coating it with thermosetting sealant. 2 Entire perimeter of E section: thermosetting sealant (equivalent of Holts Firegum ) [*4] 3 Radiator hose clamp: 10.8 – 11.8 Nm {1.1 – 1.2 kgm} [*5] 3 Joint bolt: 24 ± 4 Nm {2.4 ± 0.4 kgm} [*6] 3 Mounting bolt: 24 ± 4 Nm {2.4 ± 0.4 kgm} [*2] 3 Bracket mounting bolt: 43 ± 6 Nm {4.4 ± 0.6 kgm} [*7] 3 Fuel block mounting bolt: 32 ± 4 Nm {3.3 ± 0.4 kgm} [*3] 3 Air intake connector mounting bolt:
24 ± 4 Nm {2.4 ± 0.4 kgm} [*8] k When installing, keep the distance of more than 10 mm between the high-pressure pipe and the harness. q MIKALOR clamp a Use a new clamp. a Align the hose to the original position (marking position). a Reference Depth of insertion: 60mm (aftercooler side) a Set bridge (BR) under the clamp tightening bolt as the lap with band (BR) is Min.5mm. a Align the clamp to the original position. a Impact wrench is not applicable to use. 3 Clamp: 16 – 18 Nm {1.6 – 1.8 kgm} a When the tightening torque force is less than 16 Nm {1.6 kgm}, tighten it until the hand gap is adhered (BDG size is 0). 26 PC210, 230, 240-8