Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Removal and installation of assembly hydraulic oil cooler assembly

50 Disassembly and assembly UEN00660-00 Installation 12. Move cover (9). q Installation is done in the reverse order of re- moval. [*1] a Confirm that the heat insulating seal material (sponge) of the radiator peripheral part is not damaged. If the heat insulating seal material (sponge) is damaged, replace it to the new one. Confirm from the under cover side that convexity (A) of the radiator is correctly set to concavity (B). 13. Lift out hydraulic oil cooler assembly (10) by using eyebolt (M10) [1]. [*1] 4 Hydraulic oil cooler assembly: 25 kg q Refilling with oil (hydraulic tank) Refill hydraulic oil through the oil filler port to the specified level.

Let the oil circulate in the hydraulic system by starting the engine. Then check the oil level again. PC210, 230, 240-8 33