Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Removal and installation of final drive assembly

50 Disassembly and assembly UEN00661-00 Installation q Installation is done in the reverse order of removal. [*1] 3 Mounting bolts: 245 – 309 Nm {25 – 31.5 kgm} [*2] 3 Mounting bolts: 265 – 309 Nm {27 – 31.5 kgm} (Average torque: 275 Nm or more {28 kgm or more}) q Refilling with oil Fill the power train oil ( TO30 ) via the oil filler port to the specified level. Start the engine to circulate the oil through the pipings and recheck the oil level. q Air bleeding Refer to the Air Bleeding of Various Parts sec- tion in the Testing and adjusting chapter of this manual. PC210, 230, 240-8 3