50 Disassembly and assembly UEN00661-00 5. No.1 sun gear shaft Remove No. 1 sun gear shaft (11). 2) Disassemble No. 2 carrier assembly in the following procedure. 1] Drive pin (17) into pin (18) to remove pin (18) from carrier (19). a Remove pin (17) from pin (18) after pin (18) is removed. 2] Remove thrust washer (20), No. 2 planetary gear (21), needle bearing (22) and thrust washer (23). 6. No.1 & No.2 ring gears Remove No.1& No.2 ring gears (12). 7. Thrust washer Remove thrust washer (13). 8. No. 2 sun gear Remove No. 2 sun gear (14). 11. Locked 1) Remove lock (24). 2) Use the tool J4 to remove lock (25). 9. Washer Remove washer (15). 10. No.2 carrier assembly 1) Remove No.
2 carrier assembly (16). PC210, 230, 240-8 13