UEN00661-00 50 Disassembly and assembly Removal and installation of swing motor and swing machinery assembly Removal k Lower the work equipment to the ground completely, after the engine is stopped, loosen the hydraulic tank cap gradually to reduce the pressure inside, and set the lock lever in the lock position. a Attach an identification tag to each piping to avoid a mistake in the position of installation later. 1. Remove cover (1). 5. Disconnect 5 pcs. of swing motor hose (7) – (11). q (7): Between the swing motor – the control valve (port MA) q (8): Between the swing motor – the control valve (port MB) q (9): Suction hose (port S) q (10), (11): Drain hose (port T) 6.
Remove nipple (12) (port T). 7. Disconnect clamp (13). 8. Disconnect hose (14). 2. Open engine hood (2) and remove cover (3). 9. Remove mounting bolt (15) and disconnect drain hose (16). 3. Disconnect hose (4) and (5). (If equipped) 4. Disconnect the bracket hose Assembly (6). (If equipped) 20 PC210, 230, 240-8