50 Disassembly and assembly UEN00663-00 Installation 6. Remove 4 pcs. of mounting bolt (16). q Installation is done in the reverse order of removal. [*1] Install the center swivel joint CSJ facing in the direction shown in the figure. (The figure shows the machine body as seen from above.) a S: Sprocket A-D: Port name 7. Lift off center swivel joint assembly (17) to remove. [*1] 4 Center swivel joint assembly: 40 kg q Refilling with oil (hydraulic tank) Refill hydraulic oil through the oil filler port to the specified level. Let the oil circulate in the hydraulic system by starting the engine. Then check the oil level again. 5 Hydraulic tank: Approx. 234 l (PC210, 230) Approx.
239 l (PC240) 3 Hydraulic tank drain plug: 58.8 – 78.5 Nm {6.0 – 8.0 kgm} q Air bleeding Bleed the air from the circuit between the valve and the hydraulic cylinder. For details, see Testing and adjusting, air bleeding of various parts. PC210, 230, 240-8 3