Komatsu — 3.17.1 CENTRAL LUBRICATION SYSTEM -CLS- FOR SUPERSTRUCTURE AND ATTACHMENT

3.17 OPERATION OF THE LUBRICATION SYSTEM OPERATION 3.17 OPERATION OF THE LUBRICATION SYSTEM 3.17.1 CENTRAL LUBRICATION SYSTEM -CLS- FOR SUPERSTRUCTURE AND ATTACHMENT The central lubrication system works automatically as soon as the engine is running. The ECS System monitors the function of the central lubrication system. Trouble conditions of the lubrication system are indicated through fault messages on display (A).

Legend for illustration Z25503 (1) Switch, manual actuation of central lubrication sys- tem (2) Switch, manual actuation of swing ring gear pinion lubrication system (3) Key operated service switch (A) ECS display Manual actuation of the central lubrication system Manual actuation of the central lubrication system overrides the adjusted pause time (factory setting 60 minutes). The lubrication cycle starts after a pressure build up time of 1 to 2 minutes. Thereafter the monitoring time of 10 minutes starts. The complete lubrication cycle takes approximately 12 minutes. After this period the lubrication cycle counter adds one lubrication cycle to the memory.

For display of the cycle counter reading use the menu control of the ECS system, see page 129 for more information. REMARK The start of a manually actuated lubrication cycle can be delayed by up to 10 minutes if the system is in the monitoring time period of a previous automatic lubrication cycle. If the central lubrication system fails to work for a period of four hours automatic bucket motion cut off can happen depending on the installed ECS soft ware. Repair the system as soon as possible. 274 CAUTION CAUTION