Scania — Crankshaft

Engine Tier-3 710655- Ch 1 page 112 Crankshaft Removing 1. Remove the cylidner heads and pushrods. 2. Remove the flywheel and flywheel housing. 3. Remove the fan, fan bearing, oil sump, tim- ing gear housing and intermediate gear. 4. Remove the oil pump and all pistons and con- necting rods. 5. Remove all main bearing caps and carefully lift out the crankshaft using a lifting strap or the like which will not damage the shaft jour- nals. 6. Remove all main bearing halves and thrust washers on the 7th main bearing. Checking and grinding 1. Measure the crankshaft pivot pins. Use a micrometer to take measurements at two points 90 degrees apart.

If either of these diameters is below the spec- ified lower limit, regrinding of the crankshaft or the fitting of a replacement crankshaft should be considered. The oil pressure should also be taken into account, which is in turn also affected by wear in the main and big-end bearings. 2. When regrinding, stated undersizes must be complied with. There are bearings adapted to these dimensions. It is important that the fillet radius of the pivot pins is correct. After grinding the pivot pins, the oil hole ori- fices at the bearing surfaces should be rounded and polished. SHOP MANUAL MT26-31 - 06.2005