Doosan Infracore D18NAP — Procedure of Assembling Engine

6. About the engine CAUTION Check the attached piston and piston ring. If the piston should be replaced, replace the piston pin along with the piston. The gap between the piston pin bore and the piston pin should be within the range from 0.008 mm to 0.019 mm. 2) Sufficiently apply engine oil on the inside of the cylinder block bore and the connecting rod bearings. 3) Mount the piston and the connecting rods assembly (C) to the cylinder block with the piston 5) Mount 2 snap rings (B) on the both ends of the piston. CAUTION insertion tool (EF.120-208). Do not reuse snap rings. Assemble snap rings with the opening of the snap rings facing 12 o’clock.

CAUTION Be careful to mind the direction when attaching the piston and the connecting rod. Make the bumpy side of the connecting rod face the front of the cylinder block. 12. Attach the connecting rods assembly. CAUTION C The front engine direction is the water pump direction and the rear engine direction is the flywheel direction. A Be careful not to damage the piston and the piston rings. B 4) Attach the connecting rod caps (D). D CAUTION Be careful to mind the direction when attaching the connecting rods and the connecting rod caps. E EDL013036A Ensure that the number engraved on the connecting rods is same with that engraved on the connecting rod caps and the assembly direction is same.

1) Attach the upper connecting rod bearings (A) and the lower connecting rod bearings (D). CAUTION 5) Temporarily tighten 6 connecting rod bolts (E) by Regardless of the tolerance of the connecting rod or the crankshaft, select the top connecting rod bearings and the bottom connecting rod bearings with the yellow-marked class. Do not use the upper connecting rod bearings and the lower connecting rod bearings with the blue-marked or red-marked class when repairing the engine. Do not apply engine oil to the assembly part of the connecting rods and the bearings. You can see the oil gap by comparing the connecting rod bearing bore with the crankshaft pin outside diameter. hand.

CAUTION Do not reuse connecting rod bolts; replace them with new ones. 6) Tighten 6 connecting rod bolts (E) at a tightening torque 2.0 kgf m + 90 ° by using the angle method. CAUTION Note) The class of the connecting rod bearing is as follows. After attaching the connecting rods, rotate the crankshaft 2 or 3 times to check whether there is any interference. 6 - 29 Thickness of connecting rod bearing Specified Value YELLOW 1.498 ~ 1.502 mm