Doosan Infracore D18NAP — Procedure of Assembling Engine

6. About the engine 18. Attach the cylinder head. CAUTION Measure the step height of the piston top side and select the cylinder head gasket with the suitable mark. For methods to measure the step height of the piston top side, refer to Measurement of the step height of the piston top side in Chapter 13 (Others/Driving Units). Be careful to mind the direction when assembling the cylinder head gasket. Attach the cylinder head so that its identification mark and class mark face upward. Align the push rod hole, the cylinder head bolt hole, and the cylinder head gasket hole and attach the cylinder head. Do not reuse the cylinder head gasket but replace with new one.

Mark A has one hole of the identification mark on the cylinder head gasket, Mark B has two holes, and Mark C has three holes. C B A EDL013030A Note) The Mark of the cylinder head gasket is as follows. 10 2 7 14 6 3 3 11 13 5 4 12 9 1 8 EDL013056A Note) For method to measure the step height of the piston top side, refer to Measurement of the step height of the piston top side in Chapter 13 (Others/Driving Units). 2 1 3 2) Attach the cylinder head (B). 3) Temporarily tighten 14 cylinder head bolts (C) in the order from (1) - (14). 4) Tighten 14 cylinder head bolts (C) at a tightening torque 8.7 kgf m + 90° with the angle method. FRONT Cyl.#1 Cyl.#2 Cyl.#3 SIDE REAR SIDE .

4 CAUTION Tighten cylinder head bolts in order from (1) - (14). EDL013057A The front engine direction is the water pump direction and the rear engine direction is the flywheel direction. 1. Identification mark of the cylinder head gasket 3. Intake manifold side Do not reuse cylinder head bolts. Do not apply engine oil to the cylinder head bolts. 2. Cylinder head gasket mark 4. Exhaust manifold side 1) Align the cylinder head gasket (A) with the pin and mount it. 6 - 32 Head gasket grade Piston Protrusion Symbol (Mark) Hole Thichness A 1ea 0.9T 0.24 ~ 0.33 mm B 2ea 1.0T 0.33 ~ 0.43 mm C 3ea 1.1T 0.43 ~ 0.52 mm