DISASSEMBLY AND ASSEMBLY SWING MACHINERY 2) Install No. 2 carrier assembly (16) to shaft and case assembly. 3) Install spacer (15). 6. Ring gear Assemble O-ring to shaft and case assembly, and in- stall ring gear (14). 7 No. 1 carrier, No. 2 sun gear assembly 1) Assemble No. 1 carrier and No. 2 sun gear as- sembly as follows. i) Assemble No. 1 carrier (13) to No. 2 sun gear (12), and install snap ring (11). ii) Align position of pin holes of shaft and car- rier, then tap with a plastic hammer to install shaft (10). iii) Insert pin (9). # After inserting the pin, caulk the pin por- tion of the carrier. # Check that the stepped difference be- tween the shaft and carrier is less than 0.2 mm.
iv) Assemble thrust washer (8), bearing (7), gear (6), thrust washer (5), and install snap ring (4). 30-27