Komatsu — ASSEMBLY OF SWING MACHINERY ASSEMBLY

DISASSEMBLY AND ASSEMBLY SWING MACHINERY 2) Install No. 1 carrier and No. 2 sun gear assembly (3). 3) Install No. 1 sun gear (2). 8. Swing motor assembly Install swing motor assembly (1). Mounting bolt: 110.3 ± 12.3 Nm (11.25 ± 1.25 kgm). 9. Refilling with oil Tighten drain plug and add engine oil through oil filler. Swing machinery case: Approx. 2.5 l . 30-28