Komatsu — INSTALLATION OF SWING MOTOR ASSEMBLY

DISASSEMBLY AND ASSEMBLY SWING MOTOR REMOVAL OF SWING MOTOR ASSEMBLY Lower the work equipment completely to the ground and stop the engine. Loosen the oil filler cap slowly to release the pressure inside the hydraulic tank. Then set the safety lock lever to the LOCK position. 1. Drain oil from swing machinery case. Swing machinery case: Approx. 2.5 l . 2. Disconnect hose (1). 3. Disconnect swing motor inlet and outlet hoses (2), (3), and (4). 4. Sling swing motor assembly (5), then use forcing screws to remove. 1 Swing motor assembly: 30 kg. INSTALLATION OF SWING MOTOR ASSEMBLY Carry out installation in the reverse order to removal. 1 Swing motor assembly mounting bolt:

110.3 ± 12.3 Nm (11.25 ± 1.25 kgm). Refilling with oil (swing machinery case) # Add oil through the oil filler to the specified level. Refilling with oil (hydraulic tank) # Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then check the oil level again. Bleeding air # Bleed the air from the swing motor. For details, see TESTING AND ADJUSTING, Bleeding air. 30-29