Komatsu — INSTALLATION OF 1ST BOOM CYLINDER ASSEMBLY

DISASSEMBLY AND ASSEMBLY 1ST BOOM CYLINDER INSTALLATION OF 1ST BOOM CYLINDER ASSEMBLY Carry out installation in the reverse order to removal. 1 # When tightening the locknut, tighten so that the clearance between the plate and nut is 0.5 - 1.5 mm. 2 Inside surface of bushing when assembling pin: Anti-friction compound (LM-P). Greasing after assembling pin: Grease (LM-G). When aligning the position of the pin hole, never insert your fingers in the pin hole. # Adjust the shim thickness so that the clearance be- tween cylinder rod (7) and plate (8) is below 1 mm. # Standard shim thickness: 1.0 mm. 3 Inside surface of bushing when assembling pin: Anti-friction compound (LM-P).

Greasing after assembling pin: Grease (LM-G). When aligning the position of the pin hole, never insert your fingers in the pin hole. # Adjust the shim thickness so that the clearance be- tween cylinder bottom (9) and bracket (1) is below 1mm. # Standard shim thickness: 1.0 mm, 2.0 mm. Refilling with oil (hydraulic tank) # Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then check the oil level again. Bleeding air # Bleed the air from the cylinder. For details, see TESTING AND ADJUSTING, Bleeding air from hydraulic cylinder. 30-98