Komatsu — REMOVAL OF BOOM ASSEMBLY

DISASSEMBLY AND ASSEMBLY BOOM REMOVAL OF BOOM ASSEMBLY 1. Remove bucket and arm assembly. For details, se REMOVAL OF BUCKET, ARM AS- SEMBLY. 2. Lower boom assembly completely to the ground, then set the safety lock lever to the LOCK position. 3. Disconnect grease hose (1). 4. Sling boom cylinder assembly (2), and remove lock bolt (3). 1 5. Remove plate, then remove head pin (4). # There are shims installed, so check the number and thickness, and keep in a safe place. 2 6. Start engine, and retract piston rod, then tie piston rod with wire to prevent it from coming out, and lower it onto block. # Disconnect the boom cylinder on the opposite side in the same way.

Release the remaining pressure in the hydraulic circuit. For details, see TESTING AND ADJUSTING, Re- leasing remaining pressure in hydraulic circuit. 7. Remove clamp (5), and disconnect hoses (6) and (7), then secure to valve end with rope. # Hoses (7) are only for the service 1 additional cir- cuit. 8. Disconnect wiring connector (8) for working lamp. 3 9. Sling boom assembly and remove plate, remove foot pin (9) using tool I , then remove boom assembly (10). # There are shims installed, so check the number and thickness, and keep in a safe place. Boom assembly: 1 Piece Boom - 950 kg 2 Piece Boom - 1,250 kg 30-123