Komatsu — CLSS

STRUCTURE AND FUNCTION CLSS 2. During fine control of the control valve, when the demand flow for the actuator is within the amount dis- charged by the minimum swash plate angle of the pump, pump discharge pressure Pp is set to LS pressure P LS + 2.45 MPa (25 kg/cm 2 ). When the differential pressure between pump discharge pressure Pp and LS pressure P LS reaches the load of spring (3) (2.45 MPa (25 kg/cm 2 )), the unload valve opens, so LS differential pressure P LS be- comes 2.45 MPa (25 kg/cm 2 ). Operation Fine control of control valve When fine control is carried out on the control valve, LS pressure P LS is generated and acts on the right end of spool (4).

When this happens, the area of the opening of the control valve spool is small, so there is a big difference between LS pressure P LS and pump discharge pressure Pp . When the differential pressure between pump discharge pressure Pp and LS pressure P LS reaches the load of spring (3) (2.45 MPa (25 kg/ cm 2 )), spool (4) moves to the right in the direc- tion of the arrow, and pump circuit Pp and tank circuit T are connected. In other words, pump discharge pressure Pp is set to a pressure equal to the spring force (2.45 MPa (25 kg/cm 2 )) + LS pressure P LS , and LS differential pressure P LS becomes 2.45 MPa (25 kg/cm 2 ). 1. Unload valve 2. Sleeve 3. Spring 4. Spool Pp :

Pump circuit (pressure) P LS :LS circuit (pressure) T : Tank circuit (pressure) 10-73