. OPERATION OPERATION CHECK DUST INDICATOR dust H 2 O) dust 3 - 72 1. Check that t he red li ndicat or (1) does no (0.076 kg/cm2 , 1.1 PSI 2. If the re d line i ndicates 7.5 kP a (3 0 INCHES 2, 1.1 PSI), air mmediately. For de tails o "CHEC 4-22)". 3. After c heckin replacing press the ndicat or (1) t o return t he red line to its origina l position. O) (0.076 kg/cm eaner ement element PAGE