ENG I \.I INSPECTION AND REPAIR . . 3. Eliminate: • Carbon deposits (from piston crown and ring grooves) 4. Inspect: • Piston crown Burrs/Nicks/Damage ---t Replace. 5. Eliminate: • Score marks and lacquer deposits (from piston wall) Use 600 - 800 grit wet sandpaper. NOTE: ______________________ ___ Sand in a crisscross pattern. Do not sand excessively. 6. Inspect: • Piston wall Wear/Scratches/Damage ---t Replace. 307-002 7. Measure: • Piston-to-cylinder clearance Measurement steps: F:irst step: • Measure the cylinder bore "C" with a cylin- der bore gauge CD . NOTE: Measure the cylinder bore lie" in parallel to and at right angles to the crankshaft. Then find the average ofthe measurements.
~ Standard Wear limit Cylinder bore 73.00 - 73.02 mm 73.10 mm uc" (2.874 - 2.875 in) (2.878 in) Taper"T" 0.05mm - (0.0019in) Out of round 0.01 mm - "R" (0.0004 in) C = Maximum 0 T = (Maximum 0' or 0 2 ) - (Maximum 0 5 or 0 6 ) R = (Maximum 01, 0 3 or 0 5 ) - (Minimum 0 2 , 0' or 0 6 ) If out of specification, replace cylinder, and replace piston and piston rings as a set. 5-8 http://ReadManuals.com