I POrW R Rio 10'1 PRIMARY SHEAVE AND DRIVE V-BELT - !.III --------------------------------------------------------- 4. Tighten: • Spider Tightening steps: • Finger-tighten the spider until it stopped by fixed sheave stopper. • Hold the fixed sheave with the Clutch Spider Separator (-, YS-28890-BI CD. NOTE: ____________________ __ Securely fit the projections of the Clutch Separator Adapter ® into the fixed sheave holes. • Tighten the spider to specification using the bar wrench @. Spider: 200 Nm (20 m • kg, 145 ft Ib) 805-025 Spider has a left-hand thread. A WARNING • Do not operate the primary sheave until the LOCTITEi!!l has dried completely. Wait 24 hours before operating primary sheave.
• Since the tightening torque is high, make sure the spider, fixed sheave, and special tool are placed securely. Tighten the spider carefully to prevent cracks and/or damage to the sheaves and spider. 5. Install: • Weight and roller Installing steps: • Tighten the bolt CD. ~ Bolt: 6 Nm (0.6 m • kg, 4.3 ft Ib) • Tighten the set screw ® 50 that clearance ® between bolt and sheave surface is 0 mm (0 in). NOTE: To maintain the balance of primary sheave, the bolt CD must be installed with their threaded portions pointing in a counterclockwise direction, as illustation. 4-6 http://ReadManuals.com