Yamaha Exciter II-570 — Power Train

1 ~8jl~1 ENGAGEMENT SPEED CHECK . . ~ . 3. Inspect: • Drive V-belt Crack/VVear/Damage ~ Replace. Oil or grease adhered to the V-belt ~ Check the primary and secondary sheaves. 4. Inspect: • Primary sheave • Secondary sheave Oil or grease adhered to the primary and secondary sheaves ~ Remove the oil or grease using a rag soaked in lacquerthinner or solvent. Check the primary and secon- dary sheaves. 5. Measure: • Drive V-belt length @ Out of specification ~ Replace. Drive V-belt length: 1.130 - 1.118 mm (44.5 - 44.0 in) ENGAGEMENT SPEED CHECK 1. Place the machine on a level area of hard packed snow. 2. Check: • Clutch engagement speed Checking steps:

• Start the engine, and open the throttle lever gradually . • Check the engine speed when the machine starts moving forward. Out of specification~Adjust the primary sheave.(See page 2-41) ~ Engagement speed: Approx 3.800 r/min 2-17 http://ReadManuals.com