Komatsu — CHECK AND TIGHTEN TRACK SHOE BOLTS (MACHINE EQUIPPED WITH ROAD LINER)

. MAINTENANCE MAINTENANCE PROCEDURE right. contact 4 - 27 CHECK AND TIGHTEN TRACK SHOE BOLT (Machine e quipped wit h road liner) If the machine is used with t rack shoe break, so ti ghten any lo ose bo lts immediately oose, they will Tightening Tighte n to a tightening t orque of 127 to 142 N· m (13 to 14.5 kgf ·m, 94 to 104.9 lbft) then che ck that the nut and shoe are in close contact wit h the li nk contact Order for Tightening Tighte n the bolts in the shown After t ightening, check that th with th e lin k mating n the iagra the shoe n clos