1 page 1 Models J08C-TP and J08C-TR 3-6-16 ENGINE 4. Measure the camshaft end play. Support the camshaft with V-blocks and measure the run out at the center journal with a dial gauge. If the value exceeds the service limit, replace it. Service limit: 0.10 mm (0.0039 in.) SM3-J639 Fig. 53 IF NECESSARY, REPLACE THE CAMSHAFT GEAR. 1. Measure the length of the cam gear bolts, if the length is A or more, replace with new bolts. A = 51 mm (2.0078 in.) 2. Make sure there is no dirt or scratch on the cam- shaft gear or tightening surface of the camshaft. 3. Apply clean engine oil to the bolt seating and bolt thread, then tighten the bolt to the specified torque below. Tightening torque:
600 kg·cm (43 lb·ft) 4. Retighten them 90° (1/4 turn). NOTE: When adding torque, never untighten the nuts, even it they have been overtightened. Fig. 55 INSPECT THE ROCKER ARM ASSEMBLY AND ROCKER ARM SHAFT. 1. Measure the inside diameter of the rocker arm bush- ing with a cylinder gauge. If wear exceeds the serv- ice limit, replace it. Nominal dimension: 22.0 mm (0.8661 in.) Service limit: 22.08 mm (0.8693 in.) NOTE: When installing a bushing into the rocker arm, align the bushings with the oil holes of the rocker arm. Fig. 56 SM3-J640 A SM3-J080 Fig. 54 SM3-J081 90˚ SM3-J082