hitachi — 850.indb

ASSEMBLING INSTALLING ARM WARNING: Never allow anyone to enter into the area under the lifted arm (2). 1 1. Apply grease to boom (1) and arm (2) connecting pin (3). 2. While slinging arm (2) with a crane, align pin hole (4) of arm (2) with that of boom (1). 2 3. Install the plate between boom (1) and arm (2). Align the boom (1) bottom hole with the boss hole on the arm (2). Measure clearance “a.” If clearance “a” is 1 mm (0.04 in) or more, remove the shim on the pin and install it, as illus- trated 4 3 M1J1-06-019 WARNING: • When aligning the centers of the pin and pin hole, never put fingers into the pin hole.

• When using a hammer, wear safety equipment such as safety glasses or a hard hat to protect against injury from flying pieces of metal. • When inserting the pin, never enter into the area under the arm. 5 4. Drive the pin into the arm and boom holes. 6 5. Insert pin lock plate (5) with bolts (6). Tightening torque: 400 N•m (40 kgf•m, 290 lbf•ft) M1J1-06-020 2 Shim Pin 1 Clearance (a) M1J1-06-021 6-11