Operation—Operating the Machine Control Lever Pattern Conversion 3 2 1 A C PH B D 4 E 5 G H F SA DF SB J K P1 I SH L T142017 —UN—09MAY01 T142017 1— Pilot Signal Control Valve 2— Hose To Port D 3— Hose To Port C 4— Hose To Port A 5— Hose To Port B 1. Lower bucket to ground. Switch hose to Port C (3) with hose to Port B (5). 2. Stop engine. Remove key from switch. Port designations (letters) are on the pilot signal control valve next to the ports. CAUTION: High pressure release of oil from pressurized system can cause serious burns or penetrating injury. The hydraulic tank is pressurized. SLOWLY loosen hydraulic cap to release air to relieve pressure. CAUTION:
Prevent injury from unexpected control lever function. Install new labels on control consoles. 3. SLOWLY loosen hydraulic cap to relieve air pressure. 6. When changing to the backhoe control lever pattern, remove the old labels and install the black-on-yellow labels on the left and right control consoles near base of control levers. Labels are enclosed in Operator Manual package. 4. Remove panel on top of machine to access pilot signal control valve. NOTE: DO NOT use manufacturer's hose tags or markings on hose ends to identify hoses for this conversion procedure. The hoses must be switched on the pilot controller side (front) of the pilot signal control valve.
When changing to the excavator control lever pattern, remove the old labels and install the black-on-white labels on the left and right control consoles. 5. Disconnect and connect hoses on the pilot controller side (FRONT) of the pilot signal control valve as follows: Switch hose to Port D (2) with hose to Port A (4). Additional labels can be purchased from your authorized dealer. A control pattern selector kit is available through service parts. When installed, it changes the control lever pattern using a solenoid valve. DW90712,0000171 -19-29JUN06-1/1 2-2-7 060313 PN=47