Operation—Operating the Machine Loading Machine On a Trailer T87155 —UN—09NOV88 A—Chock Blocks CAUTION: Prevent possible injury from unexpected machine movement. During loading operations with the track frames retracted, use care when swinging the upperstructure and travelling the machine. Avoid rapid movements, sharp turns, or counterrotating. 8. Lower front-mounted equipment to the ground. 9. Stop engine. Remove key from switch. 10. Pull pilot control shut-off lever to locked position. 11. Cover exhaust opening to prevent entry of wind and water. 1. Keep the trailer bed clean. 2. Put chock blocks (A) against truck wheels. IMPORTANT: Fasten chains or cables to machine frame.
Do not place chains or cables over or against hydraulic lines or hoses. 3. Use ramp or loading dock. Ramps must be strong enough, have a low angle, and correct height. 4. Load and unload the machine on a level surface. 12. Fasten each corner of the machine to the trailer with a chain or cable with appropriate load binder 5. Turn auto-idle switch off. 13. Place blocks in front of and behind tracks. 6. Back the machine onto the ramp slowly. 7. The centerline of the machine should be over the centerline of the trailer. DW90712,000017D -19-29JUN06-1/1 Track Gauge Work Position Adjustment 1.
Remove the six cap screws (A) on the side frame to be extended (three cap screws each from the two track frame supports). 2. Swing upperstructure perpendicular to side frame. T6929BE —UN—06DEC88 A—Cap Screw Continued on next page DW90712,000017E -19-29JUN06-1/4 2-2-22 060313 PN=62