John Deere 450CLC Excavator — Check and Adjust Track Sag

Maintenance—As Required Bleed Fuel System NOTE: Under normal conditions, fuel system bleeding is not required. Priming system with primer is normally sufficient. If necessary to bleed the system, use the following procedure: If machine has been run out of fuel, engine will not start. Contact your authorized dealer for instructions. T141910B —UN—02MAY01 1. Open drain valve (1) on water separator. 2. Pump primer (2) until bowl is clear of water or debris. 3. Close drain valve. 4. Remove filter cap and lift filter up until fuel level can be observed. 5. Pump primer until fuel is within 6 inches of filter canister top. 6. Install filter and filter cap. 7. Pump primer 20 strokes. 8. Start engine.

Run engine at slow idle for 5 minutes. RG10304 —UN—02SEP99 1— Drain Valve 2— Primer TX14740,0001D39 -19-10AUG05-1/1 Check and Adjust Track Sag 1. Swing upperstructure 90° and lower bucket to raise track off ground. 2. Keep the angle (1) between boom and arm 90—110° and position the bucket’s round side on the ground. T121723 —UN—10JUN99 CAUTION: Prevent possible injury from unexpected machine movement. Place blocks under machine frame to support machine while measuring track sag. 3. Place blocks under machine frame to support machine. 1— Boom-To-Arm Angle 4. Rotate track forward two full rotations and then in reverse two full rotations.

Continued on next page TX14740,0001CD9 -19-29JUN06-1/3 3-3-4 060313 PN=82